loading

Naples, Municipio Station- Viceregal ramparts of Castel Nuovo

Date

Thursday May 19th, 2016

DATA SHEET

DATING:

Late XVI century

LOCATION:

Naples, Municipio Station

CUSTOMER:

SUDMETRO scarl

WORKS MANAGEMENT:

Eng. Filippo Cavuoto

HIGH SURVEILLANCE:

Archaeological Superintendency of Naples and Pompeii – Dr. Daniela Giampaola

Superintendence for the Environmental, Architectural, Landscape, Historical, Artistic and Demo-anthropological Heritages of Naples – Arch. Cosimo Tarì, Arch. Ugo Carughi

THE PROBLEM

In order to realize the stations – Line 1 and Line 6 – of Municipio Square it was necessary to remove the facing of tuff of the north side and facing with cement coated with plaster on the south side. The project needed  the intervention of several restorers to secure the artifacts which have to be disassembled before the disconnection cuts.

THE METHOD

The dismantling has had exceptional extension, on the south side the intervention involved  the consolidation of the plaster and the protective bandage. After the cuts it has been executed the packaging of steel cages. The facing of tuff, on the north side of the ramparts, has been completely dismantled by the restorers and operators of R.O.M.A. Consorzio and then packed into some industrial pallets.